References: Circular formwork ORBIS 

1

ORBIS - Setting up the internal formwork wall
ORBIS - Setting up the internal formwork wall

Implent of biogas in Grossetto Monte Lattaia (GR)


ORBIS - Setting up the internal formwork wall
ORBIS - Completed formwork before casting concrete
ORBIS - concrete cast of the first level
ORBIS - formwork of the second level
ORBIS - Dismantling

INTERFAMA G.m.b.H. • I-39026 Prad am Stilfserjoch • Industriezone - Kiefernhainweg 138 • T 0473.618.295 • F 0473.618.287 • IVA 01162700213 • E info(at)interfama.com