Mounting – Dismantling
• Once the weight of the ceiling is computed and the type of props is selected, the grid is positioned in such a way that the 200 cm beams run longitudinally and the hollow slab ceiling girders run in the opposite direction.
• Mounting is in the same way as above. The use of grid girders is recommended for this kind of ceiling to ensure safe working in accordance with standard safety regulations.
• After the 200x150 cm grids are assembled and inserted into the grid girders, the formwork must be arranged. Either the formwork shell or the compensation boards can be inserted as necessary.
• With earlier dismantling it must be ensured that the shuttering boards run as centred as possible on the 200 cm beams.
• Earlier dismantling is possible after 2 - 5 days.
• Only the props and 20 - 30% of the shuttering boards remain in use (see following pages).